Fiber Optic Fast Connector SC APC Field Assembly SM L11
Contact Person : Jenny
Phone Number : +86 135 3017 1335
whatsapp : +8613530171335
Minimum Order Quantity : | 1000 | Price : | Negotiate |
---|---|---|---|
Packaging Details : | 1000 Pcs/Carton G.W. : 6kg | Delivery Time : | 3-14 Days |
Payment Terms : | T/T | Supply Ability : | 6000000 PCS/Month |
Place of Origin: | Zhejiang | Brand Name: | Oryarwa |
---|---|---|---|
Model Number: | L13 SC APC |
Detail Information |
|||
Certification: | ISO9001 | Product Name: | L13 SC APC 50MM Fast Connector |
---|---|---|---|
Type: | With Embedded | Fiber Diameter: | 125μm-900μm |
Length: | 50mm | Insertion Loss: | IL ≤ 0.35 DB |
Return Loss: | ≥40dB | Tensile Strength: | >20N |
Temp. Cycle: | IL Change ≤0.35 DB | Repeatability: | ≤ 0.35 DB |
High Light: | 50mm Fibre Fast Connector,40dB Fibre Fast Connector,40dB Fast Connector SC APC |
Product Description
50mm Embedded Optical Fibre Fast Connector SC APC Field Assembly SM L13
Pre Embedded Optical Fibre Fast Connector SC APC Field Assembly SM L13
Detailed Product Description:
Product Name |
L13 SC APC Fast Connector |
Color |
Green |
---|---|---|---|
Mode Type |
With Embedded |
Insertion Loss |
IL ≤ 0.35 dB |
Return loss |
≥40 dB |
Tensile Strength |
>20N |
Operating Temp. |
-40℃~+85℃ |
Standards |
IEC61754-4 |
Environmental parameters:
Properties |
Test condition |
Test result |
---|---|---|
Vibration |
IL change ≤ 0.35 dB |
≤0.35 dB |
Flooding |
IL change ≤ 0.35 dB |
≤0.35 dB |
Repeatability |
IL change ≤ 0.35 dB |
≤0.35 dB |
Operating Temperature |
-40ºC to +85ºC | ≤0.35 dB |
Temperature Cycle |
-40ºC to +85ºC | ≤0.35 dB |
Features:
Application:
FAQ:
Q1: How can I get the sample?
Welcome to contact our saleman, and tell us your demand. we are glad to provide free sample,
our clients just need offer express account and pay the freight.
Q2: What is your MOQ?
Our MOQ is 1000PCS for Our normal models, if you need to open new mold.
MOQ will be check again based on your design.
Q3: What is your Lead time?
Our Delivery time is 3-14days. We usually keep some stocks for regular product. if we have
enough stock, then can do shipment with 3 days, if not, need to wait for production about 14days.
OEM project will be check delivery time again.
Q4: Can I do OEM/ODM?
Yes you can, we have 20 years of customized experience, our R&D team are responsible design
new product, open new molud and offer technology support. You are welcome to do OEM/ODM service.
Q5: What certifications do you have?
All our product meet IEC standard, pass REACH, RoHS test.
Enter Your Message